Sign in
FL

FOSTER L B CO (FSTR)·Q2 2025 Earnings Summary

Executive Summary

  • Q2 2025 delivered a return to organic growth with net sales $143.6M (+2.0% YoY), Adjusted EBITDA $12.2M (+51.4% YoY), and strong operating leverage from SG&A at 15.6% of sales (-200 bps YoY) .
  • Mixed vs estimates: revenue was a slight miss ($143.6M vs $144.2M*), EPS missed ($0.27 diluted vs $0.515 Primary EPS* actual $0.322*), while EBITDA beat ($12.2M vs $11.7M*) as tax rate spiked to 54.8% on UK losses with no tax benefit . Values retrieved from S&P Global.
  • Guidance was lowered: FY25 net sales to $535–$555M (from $540–$580M), Adjusted EBITDA to $40–$44M (from $42–$48M), and FCF to $15–$25M (from $20–$30M); capex ~2% unchanged .
  • Backlog/Orders strengthened: backlog $269.9M (+8.1% YoY), new orders $175.8M (+2.8% YoY), and gross leverage fell to 2.2x (from 2.7x) — setting up H2 acceleration, particularly in Rail (Rail Products +28.4% backlog; Global Friction Management +22.1%) .
  • Catalysts: backlog-driven H2 growth, reduced leverage, extended/cheaper credit facility (borrowing capacity to $150M through 2030), and continued buybacks; watch UK restructuring progress and tax normalization trajectory .

What Went Well and What Went Wrong

What Went Well

  • Strong Infrastructure execution: Precast Concrete sales +36.0% YoY; Infrastructure net sales +22.4%; segment operating income +86.8% with margin expansion (+40 bps to 23.3%) . CEO: “organic sales up 22.4%, led by 36.0% higher Precast Concrete sales” .
  • SG&A leverage and profitability: SG&A down $2.4M (-9.8%) with SG&A/sales at 15.6% (-200 bps YoY); Adjusted EBITDA +51.4% to $12.2M on modest sales growth, highlighting mix and cost discipline .
  • Orders/backlog and balance sheet: Backlog +8.1% YoY to $269.9M; gross leverage improved to 2.2x; CFO highlighted credit facility amendment expanding capacity and flexibility for growth and buybacks .

What Went Wrong

  • Rail softness: Rail net sales -11.2% YoY; segment operating income -31.9%; margin -100 bps to 19.9% driven by UK AMH exit costs ($1.1M) and softer UK demand .
  • Gross margin decline: consolidated gross margin -20 bps to 21.5% due to prior-year property sale gain ($0.8M) and current year AMH exit costs ($1.1M) .
  • Elevated effective tax rate: 54.8% in Q2 vs 10.9% last year, reflecting UK losses with full valuation allowance; CFO expects blended FY effective rate 35–40%, with future quarters 30–35% and longer-term normalization toward upper 20s .

Financial Results

MetricQ4 2024Q1 2025Q2 2025
Revenue ($USD Millions)$128.183 $97.792 $143.558
Diluted EPS ($USD)-$0.02 -$0.20 $0.27
Gross Profit Margin %22.3% 20.6% 21.5%
Operating Income ($USD Millions)$3.052 -$1.923 $7.678
Net Income Attributable ($USD Millions)-$0.242 -$2.110 $2.885
Adjusted EBITDA ($USD Millions)$7.238 $1.822 $12.231
Cash from Operations ($USD Millions)$24.3 -$26.136 $10.402
Free Cash Flow ($USD Millions)$12.841 -$28.711 $7.729

Q2 vs consensus (S&P Global):

MetricQ2 2025 ConsensusQ2 2025 Actual
Revenue ($USD Millions)$144.216*$143.558
Primary EPS ($USD)$0.515*$0.322*
EBITDA ($USD Millions)$11.686*$12.136*

Values retrieved from S&P Global.

Segment breakdown (Q2 YoY):

Segment MetricQ2 2024Q2 2025
Rail Net Sales ($USD Millions)$85.594 $75.973
Rail Gross Margin %20.9% 19.9%
Rail Operating Income ($USD Millions)$5.501 $3.747
Rail New Orders ($USD Millions)$116.996 $114.345
Rail Backlog ($USD Millions)$114.794 $130.709
Infrastructure Net Sales ($USD Millions)$55.202 $67.585
Infrastructure Gross Margin %22.9% 23.3%
Infrastructure Operating Income ($USD Millions)$3.623 $6.766
Infrastructure New Orders ($USD Millions)$53.997 $61.411
Infrastructure Backlog ($USD Millions)$135.011 $139.220

KPIs and balance sheet leverage:

KPIQ4 2024Q1 2025Q2 2025
New Orders ($USD Millions)$107.187 $149.064 $175.756
Backlog ($USD Millions)$185.909 $237.215 $269.929
Trailing 12M Book-to-Bill0.95 1.04 1.04
Gross Leverage Ratio (x)1.2x 2.5x 2.2x
Total Debt ($USD Millions)$46.940 $82.498 $81.628
Net Debt ($USD Millions)$44.486 $79.886 $77.442

Guidance Changes

MetricPeriodPrevious GuidanceCurrent GuidanceChange
Net Sales ($USD Millions)FY 2025$540–$580 $535–$555 Lowered
Adjusted EBITDA ($USD Millions)FY 2025$42–$48 $40–$44 Lowered
Free Cash Flow ($USD Millions)FY 2025$20–$30 $15–$25 Lowered
Capital Spending (% of sales)FY 2025~2.0% ~2.0% Maintained

Management emphasized H2 acceleration: midpoints imply H2 Adjusted EBITDA +42.8% YoY on +14.3% sales growth; Rail expected to drive back-half recovery .

Earnings Call Themes & Trends

TopicPrevious Mentions (Q4 2024 and Q1 2025)Current Period (Q2 2025)Trend
Rail demand & fundingQ1: slower federal funding early in year; backlog +46.9% QoQ; Rail Products backlog +63.4% QoQ, Friction Management backlog +71.4% YoY Funding release improved; Rail backlog +42.5% QoQ and +13.9% YoY; best month ever in Friction Management in Q2 Improving demand; H2 uplift
Precast Concrete growthQ1: sales +33.7% YoY; strong orders/backlog; Florida EnviroCast ramp commencing Sales +36.0% YoY; backlog solid; first EnviroCast installation in Florida Sustained strength
UK right-sizing & AMH exitQ1: scaling back UK TS&S; UK backlog down >50%; mixed drag on margins AMH exit: $1.4M restructuring charge; UK losses drove high tax rate Restructuring progressing; tax impact transitory
Tariffs & steel costsQ1: managed tariff threats; ability to pass steel price changes “Tariffs have little to no impact” currently; supply chain largely US-sourced Contained risk
Credit & capital allocationQ4/Q1: leverage down then seasonally up; new $40M buyback authorization Credit facility amended: capacity $150M to 2030; plan to lower debt and continue buybacks; $41M FCF expected in H2 midpoint Flexibility increased

Management Commentary

  • CEO: “We achieved a strong, broad recovery... with 2.0% organic sales growth delivering 51.4% higher Adjusted EBITDA... Infrastructure segment with organic sales up 22.4%, led by 36.0% higher Precast Concrete sales... SG&A percentage of sales of 15.6% improving 200 bps” .
  • CEO outlook: “Strong organic sales growth and profitability improvement to continue in the back half of 2025, led by North American demand recovery for our Rail segment... anticipate $41 million in free cash flow in the second half of 2025... reduce leverage to 1.0x–1.5x by year end” .
  • CFO: “Adjusted EBITDA was $12.2M up 51.4%... cash provided by operating activities was $10.4M... gross leverage ratio improving to 2.2x... revised guidance midpoints still assume a 25.1% increase in adjusted EBITDA” .

Q&A Highlights

  • Capital allocation: Focus on organic growth (precast/Florida facility), continued buybacks under $40M program, and debt reduction; evaluating tuck-in acquisitions selectively .
  • Backlog follow-through: Friction Management had “best month ever”; backlog supports Rail H2 sales uplift; Precast continues strong .
  • UK/tax rate: Q2 effective tax rate 55% due to UK losses without tax benefit; CFO expects 30–35% for upcoming quarters, 35–40% blended FY, normalizing to upper 20s over time .
  • EnviroCast progress: First installation; initial focus on residential; contribution modest in 2025 as ramp prioritizes quality and safety .
  • Tariffs/steel: Ability to pass through steel price increases; tariffs currently minimal impact; supply chain predominantly US .
  • Pipe coatings: Recovery trend with orders/backlog up; staffing added; near full capacity in Q2, multi-year opportunity .

Estimates Context

  • Revenue: Slight miss vs consensus ($143.6M actual vs $144.2M*). Values retrieved from S&P Global.
  • EPS: Miss vs Primary EPS consensus ($0.322* actual vs $0.515*), driven by elevated effective tax rate from UK losses with valuation allowance . Values retrieved from S&P Global.
  • EBITDA: Beat ($12.136* actual vs $11.686*), reflecting Infrastructure margin expansion and SG&A leverage . Values retrieved from S&P Global.
  • Near-term estimate revisions: H2 revenue/EBITDA likely to be revised higher on Rail backlog build and Precast strength, while tax-rate assumptions should be reset lower in H2 vs Q2 (30–35% guidance for upcoming quarters; 35–40% blended FY) .

Key Takeaways for Investors

  • Mix-led profitability: Infrastructure (Precast, Protective Coatings) drove margin expansion and EBITDA growth; expect continued mix benefits in H2 .
  • Rail set for H2 rebound: Backlog sharply higher in Rail Products and Friction Management; watch order conversion cadence in Q3/Q4 .
  • Tax normalization is a key EPS lever: Q2 EPS was burdened by UK losses; management guides to materially lower effective tax rates ahead .
  • FCF and deleveraging: Strong H2 FCF (~$41M midpoint), leverage targeted at 1.0x–1.5x by year-end; credit facility expansion increases flexibility .
  • Buyback support: ~$36.7M remaining authorization; ~6.5% of shares repurchased over 2.5 years supports per-share metrics .
  • Execution risks: UK right-sizing and Rail order timing must be monitored; AMH exit costs are behind, but TS&S backlog still lower .
  • Trading setup: Backlog momentum and guidance imply H2 acceleration; EPS sensitivity to tax-rate assumptions suggests upside if normalization progresses, while any delay in Rail funding could pressure revenue cadence .
Notes:
- Asterisks denote values retrieved from S&P Global.